Major overhaul of the CICU to place the endovideoscopy department.
«StroiReanimatsiya» corporate group acted as the general contractor for major overhaul of rooms in Children's city hospital №1 to place there endoscopy department and expand cardiac intensive care unit.
Within the project was made major overhaul of the 3rd floor of 3rd hospital block with partial redevelopment, change of room functions and complete replacement of engineering networks. Performed installation works of modern heating systems, water supply, power supply, lighting and communications, organized centralized wiring and medical gases exhast system. Also was made the restoration of marble floor covering of common hallway.
As a result of performed works, the CICU expanded on 6 beds and meets the modern sanitary hygnienic requirements due to organization of clean rooms areas, necessary auxiliary rooms, equipping with high-tech medical equipment. For today in the department created favorable and safe working conditions for medical staff to save children with malformations of the cardiovascular system of any complexity.
Specialists of «StroiReanimatsiya» performed major overhaul of rooms in order to organize a modern endoscopy department, consisting of gastroscopy procedure room, bronchoscopy procedure room and endoscope disinfection room. Also was made installation of medical modules of clean rooms with advanced technological equipment.