Reanimation department and operating rooms were put into operation.
In September 2012 were commissioned an operation unit, reanimation department, endoscopy department and also ward department.
- Also was made the installation of clean rooms complex with total area of 179.76 square meters. The complex of clean rooms includes: ceiling and wall panels, lamps, doors, automatic actuators, surgical stainless steel sinks and laminar field.
- Were renovated ward departments with total area of more than 1000 square meters.
- Was made the installation of modern medical equipment, medical gas supply systems with installation of reanimation and ward consoles manufactured by "Alternative science".
- Installation of internal and external engineering networks and communications: heating, electricity, lighting, ventilation and air conditioning, water supply and sewerage, low current networks.