Reconstruction of reanimation department
4th quarter of 2012.
- Was made reconstruction of two reanimation wards and auxiliary rooms.
- Were made general construction and engineering works in rooms of a total area of about 280 square meters.
- Development of design solution and installation of clean rooms modules.
- Was made a complete replacement of engineering networks, including the design and installation of new medical gas supply system.
- Equipment for medical gas supply and reanimation consoles manufactured by CJSC "Alternative science".