logo ENG color v2
get price list
(812) 449-97-17
sales deparment
  • Home
  • City Hospital N.14

City Hospital N.14

Major overhaul of rooms to place the angiography room.

  • Installation of medical air-conditioning modules of clean rooms in: control, operating and pre-operative rooms.
  • Replacement of engineering networks. Installation of medical gas supply internal networks.
  • Installation of ventilation system and air-conditioning with air filtration system.
  • Were held actions to provide the protection from X-ray radiation.
  • Performed general construction and engineering works in all rooms with total area of about 167.48 sq.m.

14 ГБ
14 ГБ
14 ГБ
14 ГБ

Major overhaul in rooms of Central Sterilization Department (CSD)

  • General construction and finishing works
  • Installation of air-conditioning modules of clean rooms
  • Replacement of engineering networks: ventilation and air-conditioning, heating system, installation of fire alarm system and so on.

14 ГБ
14 ГБ
14 ГБ
14 ГБ

OUR SPECIALISTS ARE READY TO OFFER A SOLUTION AND ANSWER YOUR QUESTIONS:

Phone: 8(812) 449-97-17

Equipment Sales Department: 8(800) 700-53-19

Address: St. Petersburg, Shpalernaya str. 40A

e-mail: JLIB_HTML_CLOAKING

Follow us: