Major overhaul of rooms to place the angiography room.
- Installation of medical air-conditioning modules of clean rooms in: control, operating and pre-operative rooms.
- Replacement of engineering networks. Installation of medical gas supply internal networks.
- Installation of ventilation system and air-conditioning with air filtration system.
- Were held actions to provide the protection from X-ray radiation.
- Performed general construction and engineering works in all rooms with total area of about 167.48 sq.m.
Major overhaul in rooms of Central Sterilization Department (CSD)
- General construction and finishing works
- Installation of air-conditioning modules of clean rooms
- Replacement of engineering networks: ventilation and air-conditioning, heating system, installation of fire alarm system and so on.